Florida Construction-Defect Presuit Notice Mailing Requirements

Florida requires a written construction-defect notice before suit. Certified Mail with USPS evidence is one accepted service method, alongside hand delivery and a qualifying courier.

Verified answer
Certified Mail is accepted, but documented hand or courier delivery also qualifies.

Trigger

A claimant plans to file an action alleging a construction defect.

Sender

The property owner, association, or other claimant

Recipient

The contractor, subcontractor, supplier, or design professional being noticed. For work done under a contract, the person the claimant contracted with

Timing

At least 60 days before suit; associations representing more than 20 parcels generally use a 120-day period.

Mailing method

Certified Mail with USPS evidence, hand delivery, or a courier with written delivery evidence.

Jurisdiction

Florida; verified 2026-10-28

Timing

When the notice has to go out

At least 60 days before suit; associations representing more than 20 parcels generally use a 120-day period.

Counting aid
Count the days

The notice of claim must be served at least 60 days before filing suit, or at least 120 days for an association representing more than 20 parcels.

Enter a date to see the result.

This counts calendar days from the date you enter. Florida Statutes § 558.004 says which date the count starts from, whether mailing or delivery counts, and what happens when the last day falls on a weekend or holiday. If your rule counts from delivery, allow for transit: most letters arrive about 6 business days after they are sent, and about 4 in 5 within 10.

Notice record
Contents and records to confirm
  • Refer to Chapter 558 of the Florida Statutes in the notice.
  • Describe each alleged defect in reasonable detail.
  • Identify the damage or loss resulting from each defect, if known.
  • Provide the location of each defect so the recipient can inspect it.
Bulk-ready workflow
Operational checklist
  • Classify the claimant before choosing the 60-day or 120-day period.
  • Create a recipient list for every responsible party being noticed.
  • Retain the notice, supporting exhibits, mailing evidence, and response timeline in one file.

Where KiteCourier fits

Useful for associations and construction counsel with multi-recipient cases, but event volume is lower than routine lien notices.

Product constraint

KiteCourier does not inspect defects, draft the claim, or determine the governing deadline.

Alternatives and exceptions
A Certified Mail route may coexist with other valid delivery methods or extra steps.

Alternatives

  • Hand delivery to the recipient.
  • Delivery by courier with a written receipt or other delivery evidence.

Exceptions and qualifications

  • Associations with more than 20 parcels have different timing.
  • The statute includes emergency-repair and other procedural provisions that may affect the process.

Source record

Verify the current authority

Reviewed 2026-10-28 by KiteCourier research. This guide summarizes the cited sources; it is not legal advice and does not determine whether a rule applies to a particular matter. Rules, forms, fees, and agency guidance can change.