Primary-source research
When is Certified Mail required?
Verified federal and state workflows where Certified Mail is required or expressly permitted—separated clearly, with deadlines, recipients, exceptions, and source links.
Required vs. permitted
Every guide distinguishes a mandatory Certified Mail route from one accepted delivery option.
Primary sources
Each record links directly to the controlling rule or official agency guidance reviewed.
Operational limits
Separate-copy rules, provider restrictions, and product constraints are called out before the CTA.
Showing 23 of 23 guides
3 verified guides
Banking & unclaimed property
4 verified guides
Vehicle & asset recovery
5 verified guides
Construction & liens
5 verified guides
Foreclosure & associations
3 verified guides
Relocation
1 verified guide
Medical claims
2 verified guides
Landlord & storage
Methodology
How we research and verify these guides
- 1
Pick the workflow
We list notices that are mailed because of a rule, such as foreclosure, liens, relocation, towing and unclaimed property, and score each on how often it is mailed, how clear the rule is and how well a mailing workflow fits. We publish in small groups, so we can check one group before releasing the next.
- 2
Read the primary source
We read the statute, rule or agency guidance itself, not someone’s summary of it, and link it on the page. A guide does not ship without one.
- 3
Label what the source says
Required means the source says Certified Mail or registered mail must be used. Permitted means it is expressly allowed and other methods may also work. Return receipts are labeled separately as required, optional or not specified.
- 4
Date it
Each guide shows the day we last read its source. When a source changes or we find a mistake, we update the guide and the date. Some guides were last read in August 2026 and others in October 2026, and each shows its own date.
- 5
Count the days
Where a rule is a plain count of calendar days and we re-read it recently, the guide has a day counter that works from the date you enter. The rule itself says which date the count starts from, and the guide links to it.
More on how we write and correct guides is on our editorial standards page.
The data
Download the dataset
The 23 published guides in one file: jurisdiction, status, timing, sender, recipient, method and source link for each. Last verified 2026-10-28. Free to use under CC BY 4.0; please link to this page.
Have a final notice ready to mail?
Upload one PDF or send a batch. KiteCourier handles printing, USPS Certified Mail, tracking, electronic return receipts, and organized proof records.